Contemporary Style

Print & Share

House Plan ID-17023, 4 bedrooms, 5568+2065 bricks and 95 corrugates

232

sqm Coverage

17.85

m Length

13.1

m Width

Premium Cost Implication

$250

(1 customer review)
Add to wishlist11

Add to compare

www.makazi.network | House Plan ID

17023

1

Families

0

Storeys

232

Sqm

4

Bedrooms

2065

Fndtn Blocks

5568

Walls Blocks

95

Sheets

POST 50-0
www.makazi.network | +255-657-685-268 | Ground Floor Layout for House Plan ID-17023 | Build Using Full Technical Documents (~15 Pages) to Avoid Over Costing Materials, Building Collapse & Government Penalty!

Join Membership

See CLEAR Floor Plans Before You Buy; How Much it COSTS to Build the House; Use Our Mortgage Loan & Investment CALCULATORS.

×

Join Membership

Join Membership to See Clear Floor Plans Before You Buy the Full Plan; See How Much MONEY is Needed to INVEST in Your Business In order to Get the Profit to Finance Construction of This House. What MORTGAGE to Borrow and Return Monthly to Your Bank. Also, See How Much it COSTS to Build the Foundation, Walling, Roofing, Ceiling, Painting, Doors, Windows… in All of Our Houses on This Platform so That You Can CHOOSE, COMPARE, PLAN & STRATEGIES on How to Approach Your Construction Rightly!

Join Membership

Join Membership

Join Membership to See Clear Floor Plans Before You Buy the Full Plan; See How Much MONEY is Needed to INVEST in Your Business In order to Get the Profit to Finance Construction of This House. What MORTGAGE to Borrow and Return Monthly to Your Bank. Also, See How Much it COSTS to Build the Foundation, Walling, Roofing, Ceiling, Painting, Doors, Windows… in All of Our Houses on This Platform so That You Can CHOOSE, COMPARE, PLAN & STRATEGIES on How to Approach Your Construction Rightly!

Developer
3.13 out of 5

HOUSE PLAN is a document that contains drawings, measurements and details prepared professionally to guide the builder to build the house exactly as designed by the architect. A House plan is used to prepare construction cost estimates and is a guide during negotiations and discussions in your construction. It is a required document by the Government for different procedures like application for building permit; It is also a needed document during application for a mortgage loan in your bank. When you get the house plan of your dream house, you will start to experience the strong passion and the inner motivation that push you to start carrying out your project, especially when you will be looking at the rendered pictures of the house.

 

House Plan Pages and Their Uses

 

  1. Site plan – drawings used to set the building at the right place on the plot at the beginning of the construction (how many meters from left, right, front, rear… should the building be on your plot). It also shows where should wastewater tanks to be installed
  2. Foundation plans – drawings used to build the foundation by showing dimensions of foundation trenches, plinth wall, columns etc. 
  3. Floor plans – drawings that will guide your builder on what, how and where to install walls, columns, windows, doors… in the building
  4. Furniture layouts – layout drawings that show one of the best ways to arrange your furniture in the building; they also show the spatial relationship between furniture and the room which will help you to understand the size of the room
  5. Sections – drawings that shows dimensions and details of the interior layers of the building when you cut the building from top to the bottom; they show details about the foundation, walls, lintel, beams, veranda, slabs, windows, doors, floor, under the floor, plaster, trusses, roof…
  6. Front elevations – drawings that show details and look of the building at the front side
  7. Rear elevations – drawings that show details and look of the building at the rear side
  8. Right side elevations – drawings that show details and look of the building at the right-hand side
  9. Left side elevations – drawings that show details and look of the building at the left-hand side
  10. Roof plans – drawings that show how the roof has to be and will guide your builder during roofing
  11. Wastewater drawings – drawings that show details and dimensions of wastewater components like chambers, septic tanks, soak away pit…
  12. Door and window schedules – tables or drawings that show numbers, sizes and details of windows and doors in the building; you can start to manufacture doors and windows even before the beginning of your construction by using these drawings or tables
USD ~
TZS ~
To easyen economy, Pay for the whole package or choose one or two of sub-packages and pay for it. Your paid docs will be prepared and sent to your email/WhatsApp as PDF files within 24Hrs; For printed files, will be delivered to you within 3 - 5 days depending on your location.
USD ~
TZS ~
USD ~
USD ~
USD ~
TZS ~
Maximum file size: 20 MB
USD ~

BUILDING & PLOT SIZE DETAILS

sqm
sq. steps
sq. ft
m
m
m
m
sqm
sqm
steps
steps
steps
steps
sq. steps
sq. steps
ft
ft
ft
ft
sq. ft
sq. ft

House Technical Data

A four-bedrooms house, each with a toilet inside. It has a living room, dining room, kitchen, store and one toilet for guests. It has two verandas, front and back, it also has a car parking compartment. It is beautiful and modern.

Other

4

Bedrooms

More designs are coming...
  1. These are technical thoughts in the construction of your house
  2. You will build a house that comprehends well the environment and culture
  3. It is a technical guiding path to turn the idea into reality
  4. It is the assurance to follow to carry out your construction activity
  5. It is guidance during maintenance and renovation of your house
  6. It is a required document when you apply for a building permit
  7. It helps to avoid arguments and quarrels during construction
  8. It is the main guiding document during a discussion in your construction
  9. It is the main guiding document during cost estimation of the building
  10. It is the main guiding document during the preparation of the construction schedule
  11. It helps to start buying some of the building materials early
  12. It is a guiding document during hiring and negotiation with your builder

PREPARATION

  1. Get a house plan that suit you well, fits well your plot and which you can afford in construction
  2. Purchase your house plan which has been prepared professionally from www.makazi.network wherever you are in the World and in Africa. Get all documents necessary for your construction
  3. Get the building permit from your local municipal government
  4. You can start construction after getting a building permit from your local municipal government
  5. Make a commitment from the beginning to build your house according to professional standards, using required experts and also following the house plan documents
  6. Make sure you keep well your receipts for purchases; record expenses and purchases; record construction schedules in a notebook or special file so as you can have a document to come to review what was done during future inspections on your site
  7. Normally, these are construction procedures to follow in many locations in Africa when you are building a residential house; Even though they can change depending on the type and style of the house, location and local government bylaws, so communicate with your local expert for more assistance

 

FOUNDATION CONSTRUCTION

  1. Clean the part of the plot where you will put the house on by removing all rubbishes, plants, decays and compost soil
  2. Do the setting out of the house by ensuring the house is at the right place from left, right, front, rear and orientation by following site and foundation plan documents
  3. Excavate the foundation by following section and foundation plan documents; communicate with your designer, structural and site engineers so as you can advise each other concerning the conditions of the site. Pay attention to the clay soil and water table at your site.
  4. Fumigate the foundation trenches to control pests like termite
  5. Pour well concrete in trenches of foundation by following section and foundation plan documents
  6. After the concrete has set well, you can start to build plinth walls by following foundation plans and sections documents
  7. Remember to put footings of columns by following foundation plans, floor plans and sections documents
  8. Fill and compact well the soil within rooms of the foundation
  9. Put and arrange hardcore (stones) on top of compacted soil so as to ensure the floor is strong and also to break out the rise of water from the bottom to the floor by capillary action
  10. Fumigate again on the top of the hardcore to control pests like termite
  11. Put DPM (Damp Proof Membrane) on top of hardcore to cut out water from rising to the floor
  12. Pour well the concrete on top of the DPM of your foundation by following the section document and cure it until it has settled by the guidance of a structural engineer
  13. If it is necessary to put reinforcements(steel bars) in the footings and top of the plinth wall then just do it; remember to work close with your structural and geotechnical engineer

 

WALLS CONSTRUCTION

  1. Use foundation, floor plans and section documents to set out walls of your building well
  2. Put DPC (Damp Proof Course) at the bottom of walls before you start to build them to cut out capillary action of water in walls
  3. Build your walls well and put doors, windows, openings at required places by following floor plans, sections and elevations documents; make sure your walls are very straight and strong.
  4. Install columns as per floor plans, sections and elevations documents
  5. Install lintels and beams in your house as per floor plans and sections documents…
  6. Install verandahs, columns and concrete structures at appropriate standards.
  7. For the hidden roof, ensure you build all gutters and their downpipes well. Apply waterproofing at all necessary places; make sure all gutters and downpipes are not and will not leak in future, water doesn’t settle instead flow immediately to downpipes.
  8. If there are walls on top of lintel and beams, then remember to put them well and ensure the right heights are set as per foundation plans, floor plans and sections documents
  9. You can also decide to plaster your house in this stage if possible or you can plaster later after roofing depending on your construction type, budget and preferences
  10. You can also decide to install doors and windows frames and grills in this stage or do it later depending on your construction type, budget and preferences

 

ROOF CONSTRUCTION

  1. Depending on the type and style of the house, build the roof at its best and ensure it is attractive and is not leaking. The beauty of the house is carried by the roof as for a woman is her hair
  2. For a trussed roof, you can use timber or metal truss depending on the availability and design, but we will look at metal roofing sheets and timber trusses
  3. Prepare all required materials; make sure timber is well treated and store it at shedding. Prepare roofing sheets that are durable and the ones indicated in the house plans documents. Use nails or screws that are appropriate especially those with a rubber head
  4. Fix timbers as per roof plans and sections documents. Nails or screws should be fixed well at the right position without leaking or leaving holes that will leak water. Tie and fix your trusses with steel cords to the lintel/beam or according to the technical drawings provided so as to avoid it blown by the wind
  5. Carefully put your roofing sheets on the roof while ensuring they are neatly arranged and attached on the trusses well and aesthetically pleasing
  6. Install caps, facial boards, ventilators and other roofing components according to the house plan documents
  7. Next, move to the finishing stage 👍🏽

MATERIAL+LABOUR Cost Estimates (Sampled Country is Tanzania)

These cost estimates are only for helping you to make decisions in your project, should not be taken as professional estimates (or hire a professional Quantity Surveyor); also these estimates apply only when you supervise the project yourself by buying materials from your local shop, hiring a local builder (not a contractor) except only for multi-story buildings in which its estimates are when using a local town contractor.
House Building Rate
Sh. 0.00
Chagua yaliyo sahihi

(a.) Construction Cost Estimates

Foundation
Field is required!
Estimates
Sh. 0
Field is required!
Walling
Field is required!
Estimates
Sh. 0
Field is required!
Concreting
Field is required!
Estimates
Sh. 0
Field is required!
Roofing
Field is required!
Estimates
Sh. 0
Field is required!
Windows
Field is required!
Estimates
Sh. 0
Field is required!
Doors
Field is required!
Estimates
Sh. 0
Field is required!
Flooring
Field is required!
Estimates
Sh. 0
Field is required!
Ceiling
Field is required!
Estimates
Sh. 0
Field is required!
Painting
Field is required!
Estimates
Sh. 0
Field is required!
Waste Water
Field is required!
Estimates
Sh. 0
Field is required!
Plumbing
Field is required!
Estimates
Sh. 0
Field is required!
Electricity
Field is required!
Estimates
Sh. 0
Field is required!
Others
Field is required!
Estimates
Sh. 0
Field is required!
Total Cost of Selected Stages
Sh. 0
Field is required!
Foundation
Field is required!
Estimates
Sh. 0
Field is required!
Walling
Field is required!
Estimates
Sh. 0
Field is required!
Concreting
Field is required!
Estimates
Sh. 0
Field is required!
Roofing
Field is required!
Estimates
Sh. 0
Field is required!
Windows
Field is required!
Estimates
Sh. 0
Field is required!
Doors
Field is required!
Estimates
Sh. 0
Field is required!
Flooring
Field is required!
Estimates
Sh. 0
Field is required!
Ceiling
Field is required!
Estimates
Sh. 0
Field is required!
Painting
Field is required!
Estimates
Sh. 0
Field is required!
Waste Water
Field is required!
Estimates
Sh. 0
Field is required!
Plumbing
Field is required!
Estimates
Sh. 0
Field is required!
Electricity
Field is required!
Estimates
Sh. 0
Field is required!
Others
Field is required!
Estimates
Sh. 0
Field is required!
Total Cost of Selected Stages
Sh. 0
Field is required!
Foundation
Field is required!
Estimates
Sh. 0
Field is required!
Frame
Field is required!
Estimates
Sh. 0
Field is required!
Stairs
Field is required!
Estimates
Sh. 0
Field is required!
Walling
Field is required!
Estimates
Sh. 0
Field is required!
Roofing
Field is required!
Estimates
Sh. 0
Field is required!
Windows
Field is required!
Estimates
Sh. 0
Field is required!
Doors
Field is required!
Estimates
Sh. 0
Field is required!
Finishing
Field is required!
Estimates
Sh. 0
Field is required!
Plumbing and Electricity
Field is required!
Estimates
Sh. 0
Field is required!
Total Cost of Selected Stages
Sh. 0
Field is required!
Rate of Cost Reduction on the Street
Many houses in streets are built with tricks to force low costs, which result in low quality
Field is required!

(b-1) Borrow From Your Bank to Build This House

Total Loan for Selected Stages
You can borrow from the bank using your business or salary
Tshs. 0
Field is required!
In How Many Years Do You Want to Pay Off Your Loan?
Field is required!
Loan Interest (%)
-
+
Field is required!
Your Monthly Payment
Tshs. 0.00
Field is required!
Minimum Salary (Employee)
Tshs. 0.00
Field is required!
Mortgage Interest Rate
0.00
Field is required!

Cost, Investments, Mortgage & Material Estimates

These cost estimates are only for helping you to make decisions in your project, should not be taken as professional estimates (or hire a professional Quantity Surveyor); also these estimates apply only when you supervise the project yourself by buying materials from your local shop, hiring a local builder (not a contractor) except only for multi-story buildings in which its estimates are when using a local town contractor. Estimates shown are total of material+Labor costs.

Invest to Build The Structure of This House

STRUCTURE means Foundation + Walling + Plastering + Concreting + Roofing
Total Profit You Need to Make in Your Investment
Capital needed to finance building components you selected
Tshs. 0
Field is required!
Profit per Season
Tshs. 0
Field is required!
Which Investment You Want to Do?
  • - choose investment -
  • Bean Farming
  • Maize Farming
  • Rice Farming
  • Sunflower Farming
  • Avocado Farming
  • Motorcycle Taxis
  • Pig Farming
  • Dairy Farming
  • Layer Poultry Farming
  • Broiler Poultry Farming
Field is required!
How Many Seasons You Want to Invest?
  • - choose time -
  • 1 Season
  • 2 Seasons
  • 3 Seasons
  • 5 Seasons
  • 7 Seasons
  • 10 Seasons
  • 12 Seasons
  • 15 Seasons
  • 20 Seasons
  • 25 Seasons
  • 30 Seasons
Field is required!

Size of the investment required to finance construction of the structure of the house!

0Investments in each season
Field is required!
In Total of 0Seasons
Field is required!
ONE SEASON means total time used from starting up your investment up to geting the profit/harvests. Example, One season for local Timber Farming is 8 years; Motorcycle Taxis is 1.5 years; Rain Bean Farming is 1 year; Irrigation Bean Farming is 4 months.
NUMBER OF INVESTMENTS means a total number of acres you have to cultivate; a number of motorcycles or taxis you have to put in business; a number of animals you need to raise.

(c.) Some Required Materials Rough Estimates

Note, these estimates are only to give you just a highlight on the amount of materials needed; please use your builder to give you more precise estimations of materials

Foundation Construction

6" Blocks
0pcs
Field is required!
or, Hardcore Foundation
0trips (4 cub)
Field is required!
Cement
0Bags
Field is required!
Fine Aggregate (Sand)
0.0trips (4 cub)
Field is required!
Course Aggregate
0.0trips (4 cub)
Field is required!
Oversite Hardcore
0.0trips (4 cub)
Field is required!
Damp Proof Membrane (DPM):
0meters
Field is required!

Walls Construction

Block 6"
0pcs
Field is required!
or, Interlocking Bricks
0pcs
Field is required!
or, Burnt Bricks
0pcs
Field is required!
Damp Proof Course (DPC)
0.0rolls
Field is required!
Cement for Walling
0bags
Field is required!
Fine Aggregate (Sand) for Walling
0.0trips (4 cub)
Field is required!
Cement for Plastering the Interior:
0bags
Field is required!
Fine Aggregate (Sand) for Plastering the Interior
0.0trips (4 cub)
Field is required!
Cement for Plastering the Interior
0bags
Field is required!
Fine Aggregate (Sand) for Plastering the Exterior
0.0trips (4 cub)
Field is required!
Main Steel Bars for Lintels (~12mm) (12m)
0pcs
Field is required!
Ring steel Bars for Lintels (~8mm) (12m)
0pcs
Field is required!

Roof Construction

Corrugated Roofing Sheets (0.9x3m){ft 10}
0pcs
Field is required!
Timber 2x6 (3m)
Treated softwood timber
0pcs
Field is required!
Timber 2x4 (3m)
Treated softwood timber
0pcs
Field is required!
Timber 2x2 (3m)
Treated softwood timber
0pcs
Field is required!
Treated softwood timber
Hardwood timber
0pcs
Field is required!
Valleys and Ridges for Roof (1.8m):
0pcs
Field is required!

Ceiling Installation

Gypsum/ Ceiling Body
0pcs
Field is required!

Floor and Tiles Installation

Tiles (60x60)cm, 4pcs
0boxes
Field is required!

Join Membership to See More

Join Membership to See Clear Floor Plans Before You Buy Full Plan; See How Much Money is Needed to Invest in Your Business In order to Get the Profit to Finance Construction of This House. What Mortgage to Borrow and Return Monthly to Your Bank. Also, See How Much it Cost to Build the Foundation, Walling, Roofing, Ceiling, Painting, Doors, Windows… in All of Our Houses on This Platform so That You Can CHOOSE, COMPARE, PLAN & STRATEGIES on How to Approach Your Construction Rightly!

See all of our house plans with clarity on all devices

How much does it cost to build the house till you finish it

Cost estimates to build: foundation, walls, roof, ceiling, doors…

What to pay builders for foundation, walls, roof, ceiling, doors…

How much to invest, in what business & in what time so that you can produce the profit required to finance the construction of the house

How much loan you can get & what you will be paying each month

Know all important details of all houses (more than 260) before you make decision

Construction is technical work, you need expert advice before you start so as you can make better decisions 

The service of hiring our builders is only available in East African countries only; For clients outside E.A, we have an Online Supervision Service (OSS) in which you will use your private builder and we will be guiding and supervising him online where we will be exchanging pictures, videos, documents… that we can ensure the work is done at the best. Online Supervision Service (OSS) can also be used by East African clients too.

All of our services require a client (or a client representative) to be at the site to oversee the work (work inspection, buying, taking care and storing materials); this helps to minimize the supervision costs provided that we are working with local builders and not professional contractors.

 

STEPS

  1. You will pay 5% of the labour fee so that a builder can prepare the required LIST OF MATERIALS on stage which you have selected to build; We will send the quotation within 24 hours after payments in your e-mail/WhatsApp
  2. After receiving the quotation start to prepare the required materials and also inform us when our builder should come to start work. (S/he will come within 3 days after you request him/her)
  3. You will be required to finish first 95% of the labour fee left so that the hired builder can come to your site
  4. A client will also be responsible for the provision of bus fare if your site is outside Dar es Salaam, Tanzania; Tariffs has been listed at the top form
  5. As the work progress at the site, we will continue to communicate with the builder and client to ensure the work is going well and at the best
  6. We will pay the builder per installment on sub-stages as s/he progress the work after you client has confirmed and satisfied what s/he has done
  7. For the work outside Dar es Salaam, Tanzania, a client will be required to prepare a decent bedroom which will be used by the builder and his/her team to sleep
  8. The client will not be responsible to provide a meal at the site, but the builder will handle it himself
  9. Builder will not be responsible in buying, taking care of and storing building materials, his/her responsibility at the site is only to build the house according to the drawings; Client will be responsible for buying, taking care of and storing materials
  10. The client will not be responsible for hiring construction machines unless stated before hiring the builder
  11. The client is responsible in hiring/buying formwork and scaffolds
  12. It is builder responsibility to do the work in best quality and also ensure discipline at the site and provided bedroom where s/he sleep
  13. For any enquiry or problem during construction or before construction, please be free to communicate to us here online

HIRE OUR TRAINED BUILDERS

If you are in East Africa, hire our trained builders who can come to your site to build your house at best quality. For clients outside E.A, we have an Online Supervision Service (OSS) in which you will use your private builder and we will be guiding and supervising him online where we will be exchanging pictures, videos, documents... to ensure everything is going at the best.
Choose Stages You Want to Build Now
Field is required!
House Plan and Building Permit:
Choose house plan pages and required building permits
Field is required!
Foundation
Field is required!
Walling
Field is required!
Roofing
Field is required!
Waste Water
Field is required!
Windows
Field is required!
Doors
Field is required!
Flooring and Tiling
Field is required!
Ceiling
Field is required!
Plumbing
Field is required!
Electricity
Field is required!
Painting
Field is required!
Labour Fee for Selected Stages
$ 0
Field is required!
House Plan & Building Permit Fee
$ 0
Field is required!
Which Kind of Builder You Want?
Field is required!

Stages Labour Ratio
0.00
Field is required!
Style of Supervising Your Construction Project
Field is required!
Have You Ever Built Some of Your Houses Before?
Field is required!
House Plan Price
$ 0
Field is required!
Stages Labour Ratio
0.00
Field is required!
What Steps You Want to Take Now?
The list of materials required on stages you have selected will be sent to your email/WhatsApp within 24 hours after paying 5% of the labor fee
Field is required!
How You Want to Receive Your House Plan?
Field is required!
Price According to Your Selection
$ 0
Field is required!
What Location of Your Site?
Field is required!
Bus Fare for the Builder
To and fro fare for the builder to come and return after the work
$ 0
Field is required!
Email Address to Send List of Required Materials
  • No matches found...
Field is required!
WhatsApp Number to Send List of Required Materials
  • No matches found...
Field is required!
Client Names to Write on the House Plans
  • No matches found...
Field is required!
Street Name Where the House Will be Built
  • No matches found...
Field is required!
Ward Name Where the House Will be Built
  • No matches found...
Field is required!
District Name Where the House Will be Built
  • No matches found...
Field is required!
Country Name Where the House Will be Built
  • No matches found...
Field is required!
Plot Number Where the House Will be Built
  • No matches found...
Field is required!
Block Name Where the House Will be Built
  • No matches found...
Field is required!
Exchange the Currency
Field is required!
Labour Fee for Selected Stages:~0
Field is required!
Bus Fare for the Builder:~0
Field is required!
House Plan & Building Permit Fee:~0
Field is required!
TOTAL AMOUNT TO PAY NOW:~0
Field is required!
Total Amount to Pay Now
$ 0
Field is required!
SKU 17023 Category Tags , ,

1 review for House Plan ID-17023, 4 bedrooms, 5568+2065 bricks and 95 corrugates

5.0 out of 5
1
0
0
0
0
Write a review
Show all Most Helpful Highest Rating Lowest Rating
  1. Julius

    Good

    Helpful(0) Unhelpful(0)You have already voted this

    Add a review

    Your email address will not be published. Required fields are marked *

    Shipping Policy

    Shipping

    Makazi uses different courier companies to ship physical products, depending on the intended destination. Dar es Salaam destinations are usually reached within 24 hours; Tanzania regions may need 3-7 days, while international destinations may need to wait typically up to 2 weeks.

    Digital products like (PDF and DWGs) are usually emailed to you within 24 hours after we received your payment and the work is ready accomplished.

    Refund Policy

    Returns

    We rarely offer refunds in many cases. It is important to note that no order will be refunded after the work has started to be implemented or delivery of either virtual, digital or physical products of membership, site visitation, building services, house plans, advice, followup services, digital files unless the wrong files or services have been delivered (i.e. plans with a different plan code from what had been ordered ).

    It is therefore very important to make the correct decision regarding size, overall dimensions, direction of entry, orientation, local regulations, preferences, subscriptions, workmanship etc. before making your order.

    Products or services with exceptional refunds or returns or exchange policies are directly stated in the specific product main page.


    Exchanges

    We don’t exchange products or services once the work on them has started to be implemented on intensively. Fill free to contact us for consideration on exceptional cases like membership, services, consultation excluding house plans.


    Refunds

    Refunds can take a few days to process. In most cases we refund the money back to your Makazi Wallet for virtual products like membership, site visitation, building services, house plans, advice, followup services, digital products. Membership, site visitation, advice, followup services are strictly refunded to your Makazi Wallet so that you can use to pay for other things in the platform; Other types of refunds may be done back to the payment mode you used to pay at your preference. Makazi Wallet refunds often takes around 24 hours to fulfill, even though other payment modes types may take some days; If you haven’t received a refund after a week, then first check your bank account again. Then contact your credit card company, it may take some time before your refund is officially posted. Next contact your bank. If you’ve done all of this and you still have not received your refund yet, please contact us.

    Cancellation / Return / Exchange Policy

    Returns

    We rarely offer refunds in many cases. It is important to note that no order will be refunded after the work has started to be implemented or delivery of either virtual, digital or physical products of membership, site visitation, building services, house plans, advice, follow-up services, digital files unless the wrong files or services have been delivered (i.e. plans with a different plan code from what had been ordered ).

    It is therefore very important to make the correct decision regarding size, overall dimensions, the direction of entry, orientation, local regulations, preferences, subscriptions, workmanship etc. before making your order.

    Products or services with exceptional refunds or returns or exchange policies are directly stated in the specific product main page.

    Exchanges

    We don’t exchange products or services once the work on them has started to be implemented intensively. Fill free to contact us for consideration on exceptional cases like membership, services, consultation excluding house plans.

    You May Like Again

    More designs are coming...

    Other

    Contemporary

    More designs are coming...

    Other

    0

    Storeys

    More designs are coming...

    Share With Friends & Lovers!

    Chat
    Difficult in Making Payments?
    Residential DeveloperEng. Lwifunyo MangulaWhatsApp
    Makazi | Designs
    Logo
    Generic filters
    Exact matches only
    dressing



    bed bath dress



    dressi



    Compare items
    • Total (0)
    Compare
    0

    🙏🏽 PLEASE, YOUR OPINION ABT THIS HOUSE! 🙏🏽

    Why  You  Like  it?  What  to  be  Modified?

    Any  Question  or  Recommendation?

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    House Plan ID-17023, 4 bedrooms, 5568+2065 bricks and 95 corrugates